
RelationshipCurrent ALM project support
ALM roleGateway 2 technical support
StageCurrent design and evidence review
The work
Support a complete, traceable façade route for Gateway 2.
ALM is supporting Farringdon Point with the façade design information and technical evidence needed for Gateway 2.
The work keeps the current design basis, system information, interfaces, technical submittals and outstanding decisions connected so gaps remain visible through review.
Current ALM focus
- Design-basis and requirement review
- Façade-system and interface coordination
- Technical-submittal evidence
- Gateway 2 completion support
Follow the work
