Pre-tender & PCSA

Connect the commercial commitment to a buildable technical route.

We review what has been priced, the information it relies on and the design work still needed before assumptions become risk, delay or late change.

Review routeBrief and ERs · Scope boundaries · Interfaces · Programme · Procurement evidence

Review basis

Make the assumptions visible while the route can still change.

  • Employer’s requirements and available design information
  • Package boundaries and responsibility
  • Proposed systems, interfaces and buildability
  • Missing evidence, assumptions and exclusions
  • Programme, procurement and specialist dependencies

Before the package moves

Know what is included.

Turn the tender information into a clear scope, responsibility line and record of the commercial assumptions.

Know what is unresolved.

Expose missing design, evidence, interfaces and specialist dependencies before they become programme pressure.

Know what happens next.

Leave the review with a controlled technical basis, named actions and a practical route into design.

Useful outputs

Clarified responsibilityPriced assumptions & exclusionsPCSA action recordTechnical risks & required evidenceControlled design basis

Commercial acceptance, bid decisions and client approval remain with the named parties.

Review the envelope while the commercial and technical route can still change.

Tell us about the project.

Include the current stage, the envelope package and the support you need.

ALM project drawing

Drawing viewer

Open full-size image
Selected ALM project drawing