Curtain-wall interfaces
Heads, sills, jambs, slab edges and adjoining rainscreen or roofing zones are resolved without blurring package responsibility.

Glazing, curtain wall, windows and doors
ALM coordinates glazing systems with the structure, glass, interfaces and buildability requirements.
Opening routeOpening geometry · System coordination · Interface verification · Reviewed information · Controlled issue
Where the interfaces are resolved
Heads, sills, jambs, slab edges and adjoining rainscreen or roofing zones are resolved without blurring package responsibility.
Openings, support, tolerance, perimeter seals and drainage are coordinated with the actual wall build-up.
Movement allowances, sealant geometry, pressure equalisation and water paths are checked across each critical junction.
Loads, support reactions, glass requirements and thermal continuity are aligned with the appointed specialist evidence.

Relevant team experience · Rochester Riverside School
Relevant team experience across brick-slip, fibre-cement and curtain-wall interfaces. This is not presented as a current ALM appointment.
View the experience recordWhat the appointment needs
System proposals, elevations, opening schedules, structural information, loads, facade build-ups and performance criteria.
Coordinated interface details, design review comments, schedules, marked-up evidence requirements and site-support records.
Design and coordination support; supply, manufacture and installation remain with the appointed specialists unless expressly included.