Notes on the decisions behind the envelope.
Gateway submissions, package interfaces and the information needed on site.
From design and delivery
Technical notes without invented authors or dates.
Regulation · 6 min read
Gateway 2 changes what a complete facade package looks like
Price and drawings are not enough. The design route needs assumptions, calculations, product evidence and a controlled response to change.
Read note
Technical · 5 min read
The biggest envelope risks sit between packages
Water, fire, movement and thermal continuity rarely respect subcontract boundaries. Interfaces need one coordinated design view.
Read note
Delivery · 5 min read
Design information only works when it reaches site intact
ITPs, hold points, approved details and material schedules turn design intent into repeatable installation and useful evidence.
Read noteOur evolving visual identity
A clearer expression of who we are, what we do and the value ALM brings to the built environment.