Submission-ready design information
Coordinated plans, elevations, sections, details, schedules and specifications define the proposed facade rather than leaving critical choices for construction.

Gateway 2 and Gateway 3 technical support
ALM helps organise and review building-envelope information through technical design, controlled change and completion.
Evidence continuityDesign basis · Gateway 2 package · Reviewed change · Current record · Gateway 3 evidence
What the record must show
Coordinated plans, elevations, sections, details, schedules and specifications define the proposed facade rather than leaving critical choices for construction.
Structural and thermal calculations, fire-performance evidence, tested-system information and product data are mapped to the relevant build-ups and interfaces.
The employer's requirements, Building Regulations design matters, comments and technical outputs are connected in a traceable review record.
Substitutions, site conditions and design development are assessed against the approved basis so the golden thread continues to describe the work being built.
Final revisions, installed-product records, inspection evidence and outstanding actions are organised against the controlled design record where included in the appointment.
How the support is set up
Current design, employer's requirements, fire strategy, calculations, specifications, product evidence and review comments.
Coordinated facade package, evidence matrix, design narrative, assumption register and controlled response record.
Before Gateway 2 submission, during regulator comments, or when a fragmented facade package needs technical consolidation.